Research Projects · two methods
Ask the method to earn the finding.
These public-data studies answer different questions and therefore carry different standards of proof. The comparison keeps source, evaluation, decision use and uncertainty beside each result.
Compare the two methodsTwo questions · two evidence routes
Description is not prediction.
- Studies
- 2
- Verified sources
- 4
- Files available to inspect
- 12
Evidence register
Compare the research question before comparing the result.
Every cell below is tied to a Project, an attributed source and a retained analytical result.
01Descriptive study
Road Collision Trends and Engineering Review
Turn reported collision records into a bounded inspection question.
Which one-kilometre areas should a highways engineer inspect first, and what should be checked at the location?
Inspect the complete Project- Collisions processed
- 503,475
- Casualties processed
- 640,522
- Review cells
- 65,242
One retained trace
From collision record to site question.
- 01Reported record
2024010566856
- 02Observed detail
4 casualties · 1 vehicle · 20 mph
- 03Inspection cell
E529000_N180000
- 04Human boundary
Retain the cell for inspection and ask a highways engineer to review the multi-arm junction, crossing paths and night-time sightlines.
Quanta Meridian built the SQL model and analysis from public Department for Transport records. The data does not represent client work.
02Predictive study
Cycle Hire Demand and Service Planning
Test station-demand forecasts before they enter service planning.
Which selected stations need a closer operational check before a planner changes a rebalancing or staffing plan?
Inspect the complete Project- Journeys inspected
- 3,563,266
- Station-hours
- 41,460
- Held-out forecasts
- 26,784
One retained trace
From station-hour to planner check.
- 01station-hour observation
Waterloo Station 3, Waterloo · 152 departures · Counted from unique TfL journey numbers
- 02forecast issue
Waterloo Station 3, Waterloo · 2026-05-13 06:00:00+00:00 · Only earlier observations available
- 03168-hour seasonal lag
Waterloo Station 3, Waterloo · 108 · Same station and hour one week earlier
- 04selected forecast
Waterloo Station 3, Waterloo · 161.3 · 80% interval 0.0 to 169.3
- 05error review
Waterloo Station 3, Waterloo · 9.3 hires · Flagged for station-day review
- 06planner action
Waterloo Station 3, Waterloo · Human review required · Check live availability, nearby docks and operating constraints before intervention
Powered by TfL Open Data under the Transport Data Service Licence. Quanta Meridian processed ten official 2026 journey extracts into a fixed historical research subset; no client or live operating data is used.
Start with the decision
Bring the question and the evidence that is still missing.
No client delivery is implied by these studies; both use licensed public data and retained analytical outputs.
